Server Locations
CKRAS has several Locations, the headquarters is located in Frankfurt am Main, next we operate for our Cloud Backup systems nor the location in Vienna. In brief, the game server can also be operated in Amsterdam.
Frankfurt am Main (Deutschland) Amsterdam (Niederlande) Wien (Österreich)
Routing
Our routings are optimized by our partner Aixit for perfect latency optimized.
Network
The CKRAS network consists as a full 10-Gbit network, all servers will be connected via full-duplex 1Gbit (Smartline be throttled to 100 Mbps). This allows for better reaction times and thus better pings for all users. Our network consists of HP switches that are connected redudant so that failures can be prevented by a switch
Serverdate
EPS Server
- CPU-Typ: 1x3,50 GHz
- CPU-Name: Intel Xeon E3-1270V3 3,5GHz
- RAM: 16 GB DDR3-RAM
- OS: Ckras Optimize Kernel
- 1000 FPS: 99%-100%
- Connection: 1000 Mbps
EPS PLUS+ Server
- CPU-Typ: 2x3,60 GHz
- CPU-Name: Intel Xeon E3-1280V3 3,6GHz
- RAM: 32 GB DDR3-RAM
- OS: Ckras Optimize Kernel
- 1000 FPS: 100%
- Connection: 10.000 Mbps
Smartline/ EPS Entry Server
- CPU-Typ: 1x3,40 GHz
- CPU-Name: Intel Xeon E3-1240V3 3,4GHz
- RAM: 8 GB DDR3-RAM
- OS: Ckras Optimize Kernel
- 500 FPS: 99%-100%
- Connection: 100 Mbps
All Server components be obtained from our hardware vendor Thomas Krenn AG & LS computer systems and tested there on the heart and kidneys. So you get besides perfectly matched hardware also supports high quality standards of TK to feel if the server times should have a technical problem.
→ Mainarticle: Gameserver
→ Mainarticle: Voiceserver
→ Mainarticle: GamingCloud
Traceroute
ECO-Strom
From now on we will be obtaining 100% of our electricity from climate-neutral eco-power, certified by the OK-Power label from the Consumer Advice Centre of North Rhein-Westphalia as well as by the Eco-Institute in Freiburg. We are therefore obtaining all energy used for the data centre from renewable energy sources.